Our Facilities

Avantti Medi Clear is proud to operate two state-of-the-art E-Beam sterilization facilities strategically located in Tijuana, Baja California, just a few miles from the San Diego border. Designed to serve the medical device manufacturing sector, our facilities deliver high throughput, precise dose control, and rapid turnaround times—backed by strict regulatory compliance.


Strategic Location


Our facilities are situated at the heart of the Baja California Medical Cluster, only minutes away from the Tijuana International Airport and the Otay/San Diego border crossing.


Thanks to this location, our clients benefit from:

  • Reduced cross-border shipping times
  • Lower logistics costs
  • IMEX tariff advantages under the USMCA agreement

Plant #1

  • Size: 35,201 ft² (3,270 m²)
  • Technology: 10 MeV LINAC (Linear Accelerator)
  • Sterilization Capacity: 2 to 55 kilo Grays
  • Capabilities:
  • Full automation with conveyor system
  • Precision calibration for diverse product needs
  • Real-time dosimetry and quality monitoring

This facility complies with all international regulatory requirements and quality standards, including FDA, COFEPRIS, ISO 13485, and C-TPAT.

Plant 2

In response to growing customer demand, a second, larger facility is under construction and will open by the end of Q3 2025.

  • Size: 63,799 ft²
  • Location: Tijuana, Pacífico Industrial Park
  • Power: 35 KW (upgradable to 50 KW)
  • Technology: 10 MeV vertical LINAC
  • Project Duration: 24 months
  • Dock Capacity: 5
  • Estimated Jobs Created: 50
  • Investment: $12.5M USD

This new plant will expand our capacity and allow for even faster turnarounds and greater flexibility in client support.